Remove 2026 Remove Solar Power Remove Waste
article thumbnail

Stronghold Digital Mining, DEP, Environmental Groups Settle Appeal, Require Removal Of Unpermitted Scrubgrass Power Plant's Coal Ash Pile 14 Months Faster In Venango County

PA Environment Daily

The cryptocurrency mining facility must remove the ash pile by September 2026-- 14 months sooner than initially required. The size of the toxic ash pile at the Scrubgrass cryptomining facility had turned waste coal into an even riskier form of pollution, said Patrick McDonnell, President and CEO of PennFuture.

Waste 95
article thumbnail

Singapore Unveils Blueprint for Sustainable Air Hub

Clean Energy Law

The proposed initiatives and enablers for each domain are listed below: Notable Decarbonisation Initiatives National SAF target and SAF levy – From 2026, flights departing Singapore will be required to use at least 1% of SAF. This facility would turn waste into feedstock to generate electricity or biofuel for use within the airport.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

City Of Reading Begins Energy Efficiency, Solar Energy Project To Save $13.3 Million Over 20 Years; Help Achieve City’s 100% Renewable Energy Goal

PA Environment Daily

The completion of the project is slated for late 2026. This initiative also includes the installation of solar canopies at City Hall, the Public Works building, and the Cedar parking lot, which will both generate energy and protect vehicles.

article thumbnail

DEP Publishes Appeal Notice For 2023 Consent Order With Stronghold Digital Mining On Removal Of Coal Ash, Imposing $28,800 Penalty At Waste Coal Power Plant In Venango County

PA Environment Daily

PA Bulletin, page 1262 ) The Scrubgrass Power Plant is now owned by Stronghold Digital Mining, Inc., acres of earth disturbance activities associated with constructing a small scale solar power facility that Scrubgrass conducted prior to obtaining all of the neces- sary permit from the Department. a cryptocurrency company.

Waste 75
article thumbnail

What’s another $4 billion amongst friends?

Enviromental Defense

Four billion dollars, completely wasted. billion over 14 years from 2026 to 2040, which is the term of the contracts. Meanwhile, solar power is the cheapest form of new electricity generation anywhere in the world, Ontario included. Tell the province, no more gas! Catherines. How do we know? MW/business day.

article thumbnail

Analysis: Can Inner Mongolia reach peak carbon this decade?

A Greener Life

The Energy Foundation China predicts that Inner Mongolia will be one of the last provinces to reach peak carbon, sometime between 2026 and 2030. There is huge potential for developing renewable energy in Inner Mongolia, which could be used to power other industries. An urgent need for change.

article thumbnail

How Much Land Would it Require to Get Most of Our Electricity from Wind and Solar?

Union of Concerned Scientists

Most studies show that achieving these targets will require an unprecedented increase in wind and solar power to decarbonize the power sector and meet the increased demand for zero- carbon electricity to replace fossil fuels in building, industrial and transportation sectors. times current levels by 2035.