Remove 2026 Remove Fossil Fuels Remove Law Remove Natural Gas
article thumbnail

DOE’s New Hydrogen Hubs Program Comes With Risks—And Opportunities

Union of Concerned Scientists

The November 2021 Infrastructure Investment and Jobs Act (IIJA), also referred to as the Bipartisan Infrastructure Law, or BIL, includes an $8 billion “regional clean hydrogen hubs” program that charges the Department of Energy (DOE) with the development of at least four hydrogen hubs to advance the nation’s clean hydrogen sector.

article thumbnail

PJM Interconnection Formally Files Changes To Electric Capacity Market Rules With FERC Based Largely On Unreliability Of Natural Gas-Fired Power Plants During Winter Storm Elliot

PA Environment Daily

One of the most significant changes is "enhance resource accreditation" that would more accurately assess the reliability value of natural gas-fired power plants which accounted for 70% of the power plant outages in PJM during Winter Storm Elliot.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Diesel is the Reason for the Sneezin’: Cleaner Holiday Deliveries are on the Horizon

Union of Concerned Scientists

Upcoming research from my colleague Dave Cooke shows that electric delivery trucks can reduce climate-warming emissions from driving by up to 92 percent and reduce lifecycle public health impacts by up to 85 percent compared to today’s average fossil-fueled delivery trucks.

article thumbnail

NRDC: PJM Interconnection Delays In Queue To Approve Renewable Energy Projects Threatens State Transition To Clean Energy; PJM Has Approved 35,000 MW Of Renewables

PA Environment Daily

The new NRDC report, Waiting Game: How the Interconnection Queue Threatens Renewable Development in PJM , shows that even under ongoing reform proposals, the pace of renewable development in PJM just barely meets minimum clean energy demands of state RPS laws through 2027. However, this new process is not expected to begin until 2026.

article thumbnail

DOE Announces 7 Hydrogen Hubs Eligible for $7 Billion in Funding

Renewable + Law

H2Hubs is a federal program established under the Bipartisan Infrastructure Law to provide funding to create regional networks of hydrogen producers, consumers, and local infrastructure to accelerate the use, delivery, and storage of hydrogen across the United States.

article thumbnail

How Much Land Would it Require to Get Most of Our Electricity from Wind and Solar?

Union of Concerned Scientists

A recent National Renewable Energy Laboratory (NREL) study shows that it would take less than 1 percent of the land in the Lower 48—that’s an area comparable to or even smaller than the fossil fuel industry’s current footprint. mi) less than half the area of active oil and gas leases (40,500 sq. times current levels by 2035.

article thumbnail

Fresh, April 4, 2023: Canadian Government Pledges Increased Funding for Great Lakes

Circle of Blue

Christian Thorsberg, Interim Fresh Editor This Week’s Watersheds A new bill introduced in the Ohio House would prevent the removal of oil and natural gas from beneath Lake Erie. A decision on Enbridge’s Line 5 oil pipeline tunnel will be delayed until at least 2026. Eight bodies were discovered in the St.